In API Plan 65 arrangements, leakage from the seal faces collects via a drain port and directed to a liquid-collections system via a vessel equipp with a high-level alarm.
An AESSEAL LDV can be installed to collect the leakage and can be fitted with a level switch to sound the necessary alarm as the vessel begins to fill (switches can be supplied for different zoned environments)
Features:
Download catalog for more information:Seal Support Systems